Interconnection rules, by state

Every state and the District of Columbia. What each one requires to interconnect solar or battery, read out of the governing rule or tariff rather than summarized from somewhere else, with the document linked on every page.

Seven of them publish no statewide standard at all. That is on the page too, because knowing there is nothing to comply with is worth as much as knowing the threshold.

Check an address free

Why these pages differ from every other list

Most summaries flatten the one thing that decides a job: what "system size" means. It is not the same number twice. Pennsylvania measures in volt-amps. Mississippi counts the panels rather than the inverter. Hawaii takes the smaller of the two. Thirteen jurisdictions publish a threshold and never say which. Each page below states the basis its own rule uses, in that rule's words.

What to do with this

Check a real address

The rules below are the general case. Run the free check to see which utility serves a specific address, which tier the system lands in, and what to ask.

Run the free check
Installers: keep the answer with the job

GridProjeX holds the project from here, with every value tied to the document it came from and the utility and permit tracks run to permission to operate.

How it works for installers
Utilities: see what applicants are told

The same published rules your applicants read here are the ones your queue sees. GridProjeX is the record both sides work from.

How it works for utilities