Rules by state · Utah

Provo City Power net metering

Their own published program, read and recorded. This outranks the Utah state rule wherever the two differ, because it is the program this utility actually administers.

Check an address on this utility free
How the size is measured: not published

The published limits here are stated in kilowatts without saying whether that is the inverter rating in alternating current or the array rating in direct current. On a system near a threshold that decides which band it lands in, so the checker asks the question rather than choosing an answer.

The screens that decide it

Ask the utility this, before you sell it

  1. Is the 25 kW limit measured on the inverter AC rating or the array DC rating? Nothing in the standards, the agreement or the application says.
  2. What is the application fee? The form says a non refundable fee is due as shown on the Provo City consolidated fee schedule, and the amount lives in that schedule rather than in the interconnection documents.
  3. Is the published export credit still 6.742 cents per kWh? The rate summary is captioned 2024 but the rates in it were set in 2017 and are stated to be subject to change.
  4. How long will review, inspection and meter set take? No timeline of any kind is published; the program page says only that the process takes several months.

Worth knowing before you quote

A new Provo customer does not get a one for one credit. Customers on or before 4 October 2016 are credited at the same rate as power used, up to 12.09 cents per kWh. Customers on or after 5 October 2016 are credited at 6.742 cents per kWh, roughly 56 percent of the top retail block, and any remaining credits are wiped to zero at the end of February each year with no exceptions. The customer service charge of $17.19 per connection is unchanged either way. Three requirements drive cost and are easy to miss. Provo requires an additional production meter base adjacent to the utility meter base and knife disconnect, at customer expense, purely to gather research data; Provo provides the meter but the base is on the customer. A visible break safety disconnect in a lockable metal enclosure is required at every size with no exemption. And Provo takes the renewable attributes outright, including all credits, certificates, benefits, environmental attributes, emissions reductions, offsets and allowances, so do not sell renewable energy credits into a Provo deal. The agreement terminates automatically on any change of ownership of the utility account holder, and the new owner must reapply at the new customer export rate, which is a real disclosure at the sale of a home. No insurance, no consumption cap, no aggregate cap and no screens of any kind are published; the only gate is a discretionary determination that the interconnection will not interfere with the circuit or employee and customer safety. Power output control must initiate a disconnect within three cycles on any reverse power flow condition. All system modification costs must be paid in full before connection, and Provo warns that incomplete diagrams are one of the largest sources of delay.

Source

Provo City Utilities Net Metering Standards, with the Net Metering License Agreement updated 20 October 2016, the Net Metering License Application last revised 29 June 2016 and the published Net Metering Rate Summary

Read and recorded 2026-09-12. Municipal or public utility, outside its state's interconnection rule. Its own published documents govern. A Utah municipal utility, outside Public Service Commission jurisdiction. The standards date from 2010 and predate storage entirely.

All Utah interconnection rules

What to do with this

Check a real address

The rules below are the general case. Run the free check to see which utility serves a specific address, which tier the system lands in, and what to ask.

Run the free check
Installers: keep the answer with the job

GridProjeX holds the project from here, with every value tied to the document it came from and the utility and permit tracks run to permission to operate.

How it works for installers
Utilities: see what applicants are told

The same published rules your applicants read here are the ones your queue sees. GridProjeX is the record both sides work from.

How it works for utilities

Also from CivyxIQ, if they fit what you already do: SolarProjeX for running the crews and the jobs, and Solar Home so the homeowner can follow their own project. Neither is needed to use the checker.