Check an address on this utility free
How the size is measured

the inverter AC output. The Value of Solar Rider covers a system with a capacity less than 10,000 kilowatts alternating current as measured at the inverter output, and the interconnection guide routes on kW AC throughout. There is no DC figure anywhere in the routing or the tariff, which makes Austin the cleanest single test in this group.

Size bands and what each one obliges

Under 25 kW AC, off the downtown network Size 0 to 24.999 kW

No professional engineer seal is required below 25 kW. Solar inspection is $67.67 for 1 to 50 kW of inverter nameplate, plus a $33.84 pre wire inspection. Residential plan review re review is $154.77. No insurance is required below 500 kW.

  • Auxiliary power electrical permit base fee $101.51 plus a 10 percent technology fee
  • Solar inspection fee by inverter nameplate capacity
  • Homeowner permit exemptions are not allowed for solar
25 kW to under 500 kW AC, off the downtown network Size 25 to 499.999 kW

A full set of drawings and specifications sealed by a Texas licensed professional engineer is required from 25 kW up, which is low enough to catch large residential and small commercial. An interconnection study is typically not required for equipment pre certified to UL 1741.

  • Texas professional engineer seal on drawings and specifications
  • Commercial plan review $309.54 to $773.84 by size, plus an energy storage adder
500 kW AC and above, or any size on the downtown network Size 500 to 10000 kW

Proof of insurance of at least $500,000 is required over 500 kW and at least $1,000,000 over 1 MW. All work must be under the direct supervision of a master electrician. The job begins with a feasibility study before an application is even accepted, and an interconnection study is typically required at customer expense above 1 MW.

  • $500,000 insurance over 500 kW, $1,000,000 over 1 MW
  • Feasibility study before application
  • Direct supervision by a master electrician
  • Distributed resource interconnect study fee $6,000 per site where a study is required

The screens that decide it

Ask the utility this, before you sell it

  1. What is the service transformer rating at this address? Exceeding 90 percent of it is an outright denial rather than a study.
  2. Is this address on the downtown network? Any size there is routed to the 500 kW and above process.
  3. How long will review and permission to operate take? Austin Energy publishes no approval or permission to operate interval at any stage.

Worth knowing before you quote

There is no net metering. Value of Solar is a production credit on 100 percent of metered output, currently $0.0991 per kWh for non demand and for demand customers under 1,000 kW AC of solar, and $0.0717 for demand customers at or above 1,000 kW AC. Credits cannot exceed the month’s charges, excess carries forward, and the customer forfeits any remaining unused credits when service terminates. Austin Energy aggregates all renewable energy credits. Value of Solar cannot be combined with the Load Shifting Voltage Discount Rider. Energy storage carries its own inspection fee tiers from $67.67 under 15 kW to $406.04 at 241 kW and above. Inspections must be scheduled at least seven business days in advance.

Source

Austin Energy Distribution System Interconnection Guide for Customer Owned Power Production Facilities less than 10 MW, Revision 14.0 dated 31 March 2025, with the Value of Solar Rider effective 1 November 2025 and the 2025 to 2026 Fee Schedule

Read and recorded 2026-09-12. Publicly owned utility, outside its state's interconnection rule. Its own published documents govern. Austin Energy is a city department outside Public Utility Commission of Texas jurisdiction for interconnection.

All Texas interconnection rules

What to do with this

Check a real address

The rules below are the general case. Run the free check to see which utility serves a specific address, which tier the system lands in, and what to ask.

Run the free check
Installers: keep the answer with the job

GridProjeX holds the project from here, with every value tied to the document it came from and the utility and permit tracks run to permission to operate.

How it works for installers
Utilities: see what applicants are told

The same published rules your applicants read here are the ones your queue sees. GridProjeX is the record both sides work from.

How it works for utilities

Also from CivyxIQ, if they fit what you already do: SolarProjeX for running the crews and the jobs, and Solar Home so the homeowner can follow their own project. Neither is needed to use the checker.