Rules by state · South Carolina

Horry Electric Cooperative residential solar, Rate 915

Their own published program, read and recorded. This outranks the South Carolina state rule wherever the two differ, because it is the program this utility actually administers.

Check an address on this utility free
How the size is measured: not published

The published limits here are stated in kilowatts without saying whether that is the inverter rating in alternating current or the array rating in direct current. On a system near a threshold that decides which band it lands in, so the checker asks the question rather than choosing an answer.

The screens that decide it

Ask the utility this, before you sell it

  1. Is the 20 kW rated capacity limit measured on the inverter AC rating or the array DC rating? Rate 915 does not say, and the application asks for both.
  2. What is this member’s estimated maximum annual kilowatt demand? That figure, not the 20 kW ceiling, is usually the binding limit.
  3. What is the current avoided cost rate under Attachment A? Rate 915 sets it annually by 1 January and the value is not in the published rate sheet.
  4. What screens, review timeline and interconnection standard apply? No public copy of the standard was located.

Worth knowing before you quote

Rate 915 is a demand rate, and that is the thing most likely to surprise a customer after the sale. Energy is only $0.069 per kWh with a $1.05 per day account charge, but there is a $12.00 per kW peak charge set by the highest single hour of use between 3pm and 6pm in summer and 6am and 9am in winter. The winter peak window falls before meaningful production, so the savings case is not a kilowatt hour case and should not be modeled as one. A $100 interconnection application fee is due to Horry, and proof of a minimum of $100,000 personal liability insurance is required from the homeowner, with no additional insured requirement published. Renewable energy credits associated with net excess generation are granted to the cooperative annually. The contract has a one year minimum term with 60 day written termination notice. Battery size in kWh is collected at application but no storage or non export provision is published.

Source

Horry Electric Cooperative Policy Bulletin No. 508, Interconnected Member Owned Residential Solar, Rate 915, approved 25 April 2024 and revised 28 May 2026, effective for bills rendered on and after 1 July 2026

Read and recorded 2026-09-12. Rural electric cooperative, outside the South Carolina interconnection standard. The cooperative's own published documents govern. Rate 915 references a separate Horry interconnection standard for which no public URL was found, so Horry’s tiers, screens and review timeline are unverified.

All South Carolina interconnection rules

What to do with this

Check a real address

The rules below are the general case. Run the free check to see which utility serves a specific address, which tier the system lands in, and what to ask.

Run the free check
Installers: keep the answer with the job

GridProjeX holds the project from here, with every value tied to the document it came from and the utility and permit tracks run to permission to operate.

How it works for installers
Utilities: see what applicants are told

The same published rules your applicants read here are the ones your queue sees. GridProjeX is the record both sides work from.

How it works for utilities

Also from CivyxIQ, if they fit what you already do: SolarProjeX for running the crews and the jobs, and Solar Home so the homeowner can follow their own project. Neither is needed to use the checker.