Withlacoochee River Electric Cooperative renewable generation

Their own published program, read and recorded. This outranks the Florida state rule wherever the two differ, because it is the program this utility actually administers.

Check an address on this utility free
How the size is measured

the AC rating in kW. WREC’s application collects both the gross DC and AC power ratings, but the only published threshold, the insurance trigger, is stated in kW AC.

The screens that decide it

Ask the utility this, before you sell it

  1. What is the maximum system size WREC will interconnect? No maximum is published.
  2. Is there an application or interconnection fee? None is published, and the only charge found is a $100 meter seal tampering charge.
  3. How long does review, inspection and meter set take? WREC publishes no timeline and installs the net meter only after it has inspected and verified the system size.
  4. Does WREC limit the system to a percentage of the customer’s annual consumption? The application collects estimated annual output but publishes no cap.

Worth knowing before you quote

WREC’s application asks for battery quantity and wattage and requires the one line to show the batteries, but publishes no separate storage application or export limit. Treat schedule and cost as unknown on a WREC job until the cooperative answers.

Source

Withlacoochee River Electric Cooperative Application for Renewable Generation System and Net Metering Interconnection Agreement

Read and recorded 2026-09-12. Rural electric cooperative. Not bound by the interconnection standards of Florida Administrative Code Rule 25-6.065, which applies to investor owned utilities; only the subsection (10) reporting obligation reaches cooperatives. WREC publishes no tiers, no maximum system size, no application fee and no timeline. Almost everything about a WREC job must be asked.

All Florida interconnection rules

What to do with this

Check a real address

The rules below are the general case. Run the free check to see which utility serves a specific address, which tier the system lands in, and what to ask.

Run the free check
Installers: keep the answer with the job

GridProjeX holds the project from here, with every value tied to the document it came from and the utility and permit tracks run to permission to operate.

How it works for installers
Utilities: see what applicants are told

The same published rules your applicants read here are the ones your queue sees. GridProjeX is the record both sides work from.

How it works for utilities

Also from CivyxIQ, if they fit what you already do: SolarProjeX for running the crews and the jobs, and Solar Home so the homeowner can follow their own project. Neither is needed to use the checker.