Rules by state · Florida

SECO Energy member owned renewable generation

Their own published program, read and recorded. This outranks the Florida state rule wherever the two differ, because it is the program this utility actually administers.

Check an address on this utility free
How the size is measured

the AC power output of the system in kW. SECO states its tiers and its 1,000 kW ceiling in alternating current and publishes no DC to AC conversion factor.

Size bands and what each one obliges

Tier 1 Size 0 to 10 kW

A $500 non refundable application fee is due at submittal, which is the highest small system application fee found among Florida utilities. No liability insurance is required at this tier.

  • $500 application fee at submittal
  • Interconnection agreement
Tier 2 Size 10.001 to 100 kW

A $750 application fee is due at submittal and $1,000,000 general liability insurance is required, with SECO named as an additional insured.

  • $750 application fee at submittal
  • $1,000,000 general liability insurance naming SECO as additional insured
Tier 3 Size 100.001 to 1000 kW

A $1,000 application fee is due at submittal and $1,000,000 general liability insurance is required, with SECO named as an additional insured.

  • $1,000 application fee at submittal
  • $1,000,000 general liability insurance naming SECO as additional insured

The screens that decide it

Ask the utility this, before you sell it

  1. What is the utility distribution service rating at this address? SECO limits the system to 90 percent of it.
  2. A modification to an approved system carries a $500 modification fee at any size. Will the change being considered trigger it?
  3. What is the current queue time? SECO publishes only informal step estimates and no binding approval timeline.

Worth knowing before you quote

SECO publishes no percentage of annual consumption cap and no aggregate program cap. The $500 Tier 1 application fee is non refundable and due at submittal, so it is a real cost of quoting, not just of building.

Source

SECO Energy Rate Tariff, Net Metering Sheet 16.02, Interconnection Agreement Sheets 17.0 to 17.5, and the interconnection fee schedule effective 1 May 2024

Read and recorded 2026-09-12. Rural electric cooperative. Not bound by the interconnection standards of Florida Administrative Code Rule 25-6.065, which applies to investor owned utilities; only the subsection (10) reporting obligation reaches cooperatives.

All Florida interconnection rules

What to do with this

Check a real address

The rules below are the general case. Run the free check to see which utility serves a specific address, which tier the system lands in, and what to ask.

Run the free check
Installers: keep the answer with the job

GridProjeX holds the project from here, with every value tied to the document it came from and the utility and permit tracks run to permission to operate.

How it works for installers
Utilities: see what applicants are told

The same published rules your applicants read here are the ones your queue sees. GridProjeX is the record both sides work from.