Rules by state · Florida

Clay Electric Cooperative renewable generation

Their own published program, read and recorded. This outranks the Florida state rule wherever the two differ, because it is the program this utility actually administers.

Check an address on this utility free
How the size is measured: not published

The published limits here are stated in kilowatts without saying whether that is the inverter rating in alternating current or the array rating in direct current. On a system near a threshold that decides which band it lands in, so the checker asks the question rather than choosing an answer.

Size bands and what each one obliges

10 kW or less Size 0 to 10 kW

Clay requires $100,000 of personal injury and property damage liability insurance even at this size. Most Florida utilities require none below 10 kW.

  • $100,000 personal injury and property damage liability insurance
  • Interconnection agreement
  • Trip fee for the net meter set
Above 10 kW Size 10.001 to 1000 kW

Insurance steps up to $1,000,000. Pre approval is required, and Clay’s documents disagree on whether that threshold is 20 kW or 50 kW.

  • $1,000,000 liability insurance
  • Pre approval before installation
  • Interconnection agreement

The screens that decide it

Ask the utility this, before you sell it

  1. Clay’s documents disagree on the pre approval threshold, 20 kW in the agreement and on the website against 50 kW on the application form. Which governs?
  2. How does Clay compute the gross power rating used in the 90 percent test, from the AC rating in the agreement or the DC rating the application asks for?
  3. What is the service entrance rating and transformer kVA at this address? The system must stay under 90 percent of both.
  4. If a battery is included, confirm the non export requirement and whether an automatic transfer switch or a specific inverter is expected.

Worth knowing before you quote

Clay bars battery export outright: storage integrated with a renewable system is for the customer’s use and must not export, an automatic transfer switch or special inverter is required, a permanent label reading "Battery storage utilized in this facility" must be fixed at the meter enclosure, and standalone storage without generation may not interconnect at all. A trip fee applies for the net meter set. Clay does not publish an aggregate program cap; its 2021 report to the Commission showed 1,744 interconnections totaling about 14,260 kW.

Source

Clay Electric Cooperative Net Meter Application and Photovoltaic Interconnection Agreement

Read and recorded 2026-09-12. Rural electric cooperative. Not bound by the interconnection standards of Florida Administrative Code Rule 25-6.065, which applies to investor owned utilities; only the subsection (10) reporting obligation reaches cooperatives. Clay files the subsection (10) report with the Commission but sets its own interconnection terms.

All Florida interconnection rules

What to do with this

Check a real address

The rules below are the general case. Run the free check to see which utility serves a specific address, which tier the system lands in, and what to ask.

Run the free check
Installers: keep the answer with the job

GridProjeX holds the project from here, with every value tied to the document it came from and the utility and permit tracks run to permission to operate.

How it works for installers
Utilities: see what applicants are told

The same published rules your applicants read here are the ones your queue sees. GridProjeX is the record both sides work from.

How it works for utilities

Also from CivyxIQ, if they fit what you already do: SolarProjeX for running the crews and the jobs, and Solar Home so the homeowner can follow their own project. Neither is needed to use the checker.